Construction stages on site
Four key stages captured on site: stone work and facade progress, slab works, structural progress with crane and scaffolding, and excavation with raft formation.
Stone Work
Facade progress, finishing layers, scaffold mesh, and front elevation development.
Slab Works
Rebar fixing, void-form panels, inspections, and night work before casting.
Structural Stage
Column formwork, scaffolding systems, crane operations, and upper-level structure.
Retaining Wall Works
Formwork bracing, rebar fixing, and wall preparation before concrete works.
Excavation & Raft Formation
Digging, drilling, and shoring before raft layout and foundation trenches.