FAQ
Questions
Frequently Asked
Here are some of the most common questions people ask when planning construction projects with Bonyan Group in Kuwait.
What makes Bonyan different from other construction companies in Kuwait?
+Bonyan follows an engineering-led approach supported by BIM, QA/QC cycles, and a technical office that reviews drawings, BOQ, timelines, and coordination before execution. This reduces mistakes, avoids delays, and keeps the project more controlled from tender to handover.
What services do you provide?
+We handle EPIC works, project and construction management, excavation, shoring, concrete and skeleton works, MEP, finishes, BIM coordination, QA/QC inspections, and full technical office support for both villas and commercial projects in Kuwait.
Why is BIM important during construction?
+BIM gives clear visibility of architecture, structure, and MEP before execution. It helps detect clashes, improves accuracy, reduces rework on site, and strengthens coordination between consultants, contractors, and suppliers.
What is included in below-0.00 basement work?
+Below-0.00 work includes excavation, shoring, raft and retaining wall coordination with MEP, waterproofing, drainage systems, backup systems, and foundation support. These protect the structure from water pressure, soil movement, and long-term basement problems.
How do you ensure quality control on site?
+Quality is managed through internal inspections, consultant approvals, external lab tests, and QA/QC checklists. Each stage is checked and documented before moving to the next, so the structure and finishes follow the design and specifications.
How does the technical office support the project?
+The technical office reviews drawings, prepares details, checks quantities, coordinates with consultants, follows up on approvals, and supports planning. This keeps the site team working with clear drawings and reduces changes and mistakes during execution.
What equipment is typically used during site preparation?
+Site preparation usually includes fencing, signage, safety setups, portable offices, storage areas, temporary services, and tower cranes or lifting equipment when needed. This keeps the site organized, safe, and ready for structural work.
What does the skeleton phase include?
+The skeleton phase covers licenses and permits, site preparation, remarking, shoring, excavation, masonry, pesticide treatment, plaster, plain concrete, waterproofing, mortar, backup systems, drainage, retaining walls, and column supports until the main structure is complete.
Do you work on both villa and commercial projects?
+Yes. We work on villas, residential buildings, commercial plazas, cafés, offices, and mixed-use projects . The same engineering process, coordination, and quality control are applied to both residential and commercial jobs.
What affects construction cost in Kuwait?
+Cost is influenced by structure type, number of basements, material selection, MEP load, finishing level, waterproofing systems, design complexity, and project schedule. Soil conditions and special backup or retaining systems can also affect the final budget.
Do you follow safety procedures on site?
+Yes. Safety includes site fencing, access control, PPE for workers, supervision, signage, and safety planning before excavation, shoring, and structural work. Safety reviews continue until the project is handed over.
Let's Build Together
Share your ideas, site, or upcoming project. Our team will help turn them into a clear construction plan with strong execution, supported by an experienced construction company in Kuwait.